Hamburg-Bergedorf, Germany Phone 040 66969 120Mobile 040 66969 121info@kalwer-netzbau.example

Trade 03 · Optical fibre

Fibre installation

Blowing microcables, splicing in street cabinets, closures and transfer points, testing and documentation.

Two installers at the van with cable drum and blowing equipment in front of an open street cabinet
Blowing at the street cabinet · Fibre installation
Yellow splicing tent over an open street cabinet, a cable drum in front
Splicing tent at the cabinet · Fibre installation
Open splice tray with colour-coded fibres in a street cabinet
Splice tray in the street cabinet · Fibre installation · 9 September 2025 · Hamburg-Bergedorf

1Service items

ItemServiceDescriptionUnit
03.10Blowing microcableBlowing with compressed air into the microduct bundle, blowing record with length and pressure.m
03.20SplicingFusion splicing in street cabinets, closures and building transfer points.splice
03.30Splice traysPopulating and labelling splice trays according to the allocation plan.pc
03.40TestingTesting of every fibre with a test record.fibre
03.50DocumentationSplice, test and blowing records, photos and as-built data for the network operator.LS

2Sequence

  1. Blowing

    Compressed air carries the microcable through the duct bundle – from the street cabinet to the house connection.

  2. Splicing

    In the splicing tent we join the fibres in cabinets, closures and transfer points and place them in the tray.

  3. Testing

    Every fibre is tested and recorded. With photos and allocation plan, the documentation goes to the network operator.

3Equipment

Equipment
EquipmentUseType / make
Blowing equipment with drum standBlowing microcable2 blowing machines
Splicing tentWeather protection at the cabinet3
Fusion splicerFusion splicing3 core-alignment splicers
Test equipmentTesting every fibreOTDR and power meter

4Photos

Two installers at the van with cable drum and blowing equipment in front of an open street cabinetEnlarge photo
Blowing at the street cabinetFibre installation
Yellow splicing tent over an open street cabinet, a cable drum in frontEnlarge photo
Splicing tent at the cabinetFibre installation
Open splice tray with colour-coded fibres in a street cabinetEnlarge photo
Splice tray in the street cabinetFibre installation · 9 September 2025 · Hamburg-Bergedorf
Open street cabinet with splice trays and colour-coded microductsEnlarge photo
Street cabinet after splicingFibre installation
Seen from above: two installers with helmets in a pit sorting microducts and fibre cablesEnlarge photo
Ducts and fibres in the pitFTTH network

5Enquiry

Enquire: Fibre installation

This trade's items can be carried straight into the enquiry form.

Enquire

Contact

Request a project

Send us your bill of quantities, route plan or simply location and scope. We will get back to you personally.

Enquire now040 66969 121

Contractor
Kalwer Netzbau, Bergedorf
Contact person
Jens Kalwer · j.kalwer@kalwer-netzbau.example
Working hours
Monday to Friday, 8 am – 5 pm