Trade 01 · Civil works · Core trade

Civil works

Trenches, house connection trenches, hand excavation, traffic management and surfaces – with our own equipment and crews.

Workers resetting grey paving stones on a footpath, a wheelbarrow of grit beside them
Paving being reset · Civil works
Coils of orange microduct at the edge of the trench, a plate compactor behind them
Duct coils and compactor along the route · Civil works · 14 June 2022
Residential street with a freshly asphalted strip along the kerb, brick houses behind
Route closed, asphalt reinstated · Civil works · 20 September 2022 · Großhansdorf

1Services

  • Cable and utility trenches

    Open-cut construction in roads, footpaths and open ground: breaking up, excavation, laying and backfill compacted in layers.

  • House connections

    From the distribution point to the house wall: connection trenches and building entries for fibre and utility lines.

  • Crossings

    Road, path and driveway crossings – coordinated with the road authority and traffic authority.

  • Traffic management

    Site safety according to the traffic order, so residents, pedestrians and traffic can pass safely.

  • Surface reinstatement

    Asphalt, paving, slabs and green areas – restored as found.

  • Documentation

    Measurements, photo documentation and as-built records for network operators and clients.

2Service items

What we take on in civil works – as items, the way they appear in the bill of quantities.

ItemServiceDescriptionUnit
01.10Open-cut cable trenchBreaking up, excavation and shoring, laying in the sand bed, backfilled and compacted in layers – in footpaths, roads and open ground.m
01.20House connection trenchFrom the branch on the route to the house wall – coordinated with owner and network operator.pc
01.30Hand excavationBy hand at existing utilities, in root zones and wherever an excavator cannot reach.m
01.40Surface reinstatementPaving, slabs, asphalt and green areas – restored as found.m²
01.50Traffic managementSite safety according to the traffic order: beacons, barriers, signage.LS
01.60Measurement and photo docu­mentationMeasurements and photos with time and location stamp for network operators and clients.LS

3Methods

Methods
MethodUseKalwer Netzbau
Open-cut constructionRoutes in footpaths, roads and open groundown crews
Hand excavationHouse connections, existing utilities, root zonesown crews
Paving and asphalt workSurface after backfillingown crews
Soil displacement (impact mole)House connection under driveway or gardenthrough partner firms
Directional drilling (HDD)Road and watercourse crossingsthrough partner firms
MicrotrenchingNarrow routes in asphaltthrough partner firms

4Standard cross-section

A cable route in cross-section: surface, base course, backfill, warning tape, sand bed and duct bundle. Kalwer Netzbau builds every layer itself.

Trench width Cover Surface course Base course Backfill Warning tape Sand bed Duct bundle Charging point Foundation
  1. 01 · Civil works

    Trench

    Breaking up, excavation and shoring, then backfilling and compaction in layers.

  2. 02 · FTTH · Fibre

    Duct

    Microduct bundle and cable ducts to DIN 16874 in the sand bed with warning tape above; then blowing and splicing.

  3. 03 · E-mobility

    Connection

    Cable route to the charger's foundation, installation and commissioning of the station.

  4. 04 · Surface

    Finish

    Asphalt or paving reinstated and joined to the existing surface.

5Construction sequence

  1. Site visit and quotation

    We inspect the route on site and then send you a written quotation.

  2. Permits

    Excavation permit and traffic order are obtained before work starts.

  3. Breaking up and excavation

    The surface is cut and removed, the trench excavated and secured.

  4. Laying

    Ducts and cables are laid in the sand bed, with route warning tape above.

  5. Backfill

    Backfilled and compacted in layers so that nothing settles later.

  6. Surface

    Asphalt or paving is reinstated.

  7. Acceptance and documentation

    Handover with measurements, photos and as-built records.

6Photos

Crew in high-visibility clothing at a narrow trench in the footpath, a brick church tower in the backgroundEnlarge photo
Crew on the footpathCivil works
Flatbed truck and mini excavator at a site secured with red and white barriersEnlarge photo
Site set-up with truck, mini excavator and barriersCivil works
Coils of orange microduct at the edge of the trench, a plate compactor behind themEnlarge photo
Duct coils and compactor along the routeCivil works · 14 June 2022
Workers resetting grey paving stones on a footpath, a wheelbarrow of grit beside themEnlarge photo
Paving being resetCivil works
Residential street with a freshly asphalted strip along the kerb, brick houses behindEnlarge photo
Route closed, asphalt reinstatedCivil works · 20 September 2022 · Großhansdorf

7Enquiry

Enquire: Civil works

This trade's items can be carried straight into the enquiry form.

Enquire

Contact

Request a project

Send us your bill of quantities, route plan or simply location and scope. We will get back to you personally.

Enquire now040 66969 121

Contractor
Kalwer Netzbau, Bergedorf
Contact person
Jens Kalwer · j.kalwer@kalwer-netzbau.example
Working hours
Monday to Friday, 8 am – 5 pm