| Year | Place | Trade | Work | Scope | Client |
|---|---|---|---|---|---|
| 2022 | Großhansdorf (Stormarn district) | Civil works · FTTH network | Cable trench, microduct bundle, surface | 4.2 km route, 310 house connections | General contractor |
| 2024 | Neu Wulmstorf (Harburg district) | E-mobility | Building a rapid charging park, testing | 8 charging points | Charging infrastructure operator |
| 2025 | Hamburg-Bergedorf | Fibre installation | Splicing in the street cabinet | 12 street cabinets | Network operator |
| 2025 | Service area on the A 1 | E-mobility | Rapid charging station | 4 charging points | Charging infrastructure operator |
Site diary
All photos.
Enlarge photoCivil worksCrew on the footpath
Enlarge photoCivil worksSite set-up with truck, mini excavator and barriers
Enlarge photoCivil works · 14 June 2022Duct coils and compactor along the route
Enlarge photoCivil worksPaving being reset
Enlarge photoCivil works · 20 September 2022 · GroßhansdorfRoute closed, asphalt reinstated
Enlarge photoFTTH network · 12 September 2022 · GroßhansdorfOpen trench with duct bundle
Enlarge photoFTTH network · 2 June 2022 · Großhansdorf-SchmalenbeckMicroduct bundle in the sand bed
Enlarge photoFTTH networkMicroducts for the house connection
Enlarge photoFTTH networkDucts and fibres in the pit
Enlarge photoFTTH networkBuilding entry in the basement
Enlarge photoFTTH networkBuilding transfer point and entry
Enlarge photoFibre installationBlowing at the street cabinet
Enlarge photoFibre installationSplicing tent at the cabinet
Enlarge photoFibre installation · 9 September 2025 · Hamburg-BergedorfSplice tray in the street cabinet
Enlarge photoFibre installationStreet cabinet after splicing
Enlarge photoE-mobilityLow-voltage distribution for the charging park
Enlarge photoE-mobility · 5 March 2024 · Neu WulmstorfBuilding a rapid charging park
Enlarge photoE-mobilityCable pulling to the charging point
Enlarge photoE-mobilityInstalling the power unit
Enlarge photoE-mobilityCable connection with lugs
Enlarge photoE-mobility · 14 March 2024 · Neu WulmstorfTesting at the distribution cabinet
Enlarge photoE-mobilityCharging station on the motorway
Enlarge photoE-mobilityRapid chargers in operation
Site board
Request a project.
Send us your bill of quantities, route plan or simply location and scope. We will get back to you personally.
- Project
- Your project
- Contractor
- Kalwer Netzbau, Bergedorf
- Contact person
- Jens Kalwer
- Working hours
- Monday to Friday, 8 am – 5 pm
- Phone
- 040 66969 120