Trade 01 · Civil works
Civil works
Cable and utility trenches, house connections, crossings, traffic management and surface reinstatement – with our own crews and equipment.

Items
What we take on in civil works.
What we take on in civil works – as items, the way they appear in the bill of quantities.
- Item 01.10 · m
Open-cut cable trench
Breaking up, excavation and shoring, laying in the sand bed, backfilled and compacted in layers – in footpaths, roads and open ground.
- Item 01.20 · pc
House connection trench
From the branch on the route to the house wall – coordinated with owner and network operator.
- Item 01.30 · m
Hand excavation
By hand at existing utilities, in root zones and wherever an excavator cannot reach.
- Item 01.40 · m²
Surface reinstatement
Paving, slabs, asphalt and green areas – restored as found.
- Item 01.50 · LS
Traffic management
Site safety according to the traffic order: beacons, barriers, signage.
- Item 01.60 · LS
Measurement and photo documentation
Measurements and photos with time and location stamp for network operators and clients.
Methods
Methods at a glance.
| Method | Use | Kalwer Netzbau |
|---|---|---|
| Open-cut construction | Routes in footpaths, roads and open ground | own crews |
| Hand excavation | House connections, existing utilities, root zones | own crews |
| Paving and asphalt work | Surface after backfilling | own crews |
| Soil displacement (impact mole) | House connection under driveway or garden | through partner firms |
| Directional drilling (HDD) | Road and watercourse crossings | through partner firms |
| Microtrenching | Narrow routes in asphalt | through partner firms |
Sites
Photos from our sites.
Enlarge photo
Enlarge photo
Enlarge photo
Enlarge photo
Enlarge photoConstruction sequence
From breaking ground to acceptance.
Site visit and quotation
We inspect the route on site and then send you a written quotation.
Permits
Excavation permit and traffic order are obtained before work starts.
Breaking up and excavation
The surface is cut and removed, the trench excavated and secured.
Laying
Ducts and cables are laid in the sand bed, with route warning tape above.
Backfill
Backfilled and compacted in layers so that nothing settles later.
Surface
Asphalt or paving is reinstated.
Acceptance and documentation
Handover with measurements, photos and as-built records.
Site board
Request a project.
Send us your bill of quantities, route plan or simply location and scope. We will get back to you personally.